St Sidwells Point Leisure Centre, Exeter
MCS
Rainscreen Façade
As the UK’s first Passivhaus leisure centre, this was a pioneering and highly revered project. And with no reference to speak of to influence design, everything was completely unique, requiring specialist and very much a team ethos in order to overcome any challenges.